Questo sito usa cookie di analytics per raccogliere dati in forma aggregata e cookie di terze parti per migliorare l'esperienza utente.
Leggi l'Informativa Cookie Policy completa.

Libros antiguos y modernos

Cjb Technical Services, Ltd.

[MIDDLE EASTERN OIL AND GAS] Report on the piping and utilisation of natural gas in the Batman area of Turkey, prepared under British Technical Assistance arrangements for the Turkish Petroleum Corporation (T.P.A.O.), September 1969.

CJB Technical Services, Ltd., 1969

950,00 €

Khalkedon Books, IOBA, ESA Bookshop

(Istanbul, Turquía)

Habla con el librero

Formas de Pago

Detalles

Año de publicación
1969
Lugar de impresión
London
Autor
Cjb Technical Services, Ltd.
Páginas
0
Editores
CJB Technical Services, Ltd.
Formato
4to - over 9¾ - 12" tall
Materia
Middle East, Science
Descripción
Hardcover
Conservación
Muy bueno
Idiomas
Inlgés
Encuadernación
Tapa dura

Descripción

Original bdg. 4to. (30 x 25 cm). In English. [4], 96 p., 7 folding plans of plants, drawn by T. Wood, one folded huge map in the end-pocket (size: 141x50 cm) showing proposed gas pipeline, Dodan to Raman (Batman), alternative routes of the area. Scarce and very detailed typewritten report on the piping and utilization of natural gas and oil in the Batman area of Turkey, prepared under the British Technical Assistance arrangements for the Turkish Petroleum Corporation (T.P.A.O.), in September 1969. "In response to a request from the Government of Turkey, this report has been prepared under the British Technical Assistance arrangements to advise the Turkish Petroleum Corporation (T.P.A.O.) in matters relating to the use of and piping of natural gas in the Batman area of Turkey." The Dodan gas field lies approx. 70 kilometers from Batman refinery and the Bati Raman Oil Field. This study investigates the economics of piping the gas from Dodan to Batman and the separation and utilization of the gas fractions.
Logo Maremagnum es